Data Contingency planning
Data contingency design and planning with 3 solutions each inline with min bearable downtime and lost time. This project took 3 months to design, carefully consider all factors of down time (minimized), up-time, data safety, cost, as well as return of investment. However at the end of the day this project was turndown at the 2nd meeting on the board meeting. The cost is the only issues.